Tape slitting machine operation precautions–
Tape slitting machine is an important equipment in the processing industry. Tape manufacturers use this equipment almost every day. If a failure occurs, it will hinder the production process and the manufacturer will suffer losses. Generally speaking, if the staff does not pay attention to daily maintenance, then based on these circumstances, our company also has some corresponding preventive measures:
1. Ensure that the voltage, current and hydraulic equivalents are correct and stable before starting the machine.
2. Before the equipment is ready for operation, all personnel must notify the departure device to ensure personal safety before starting
operation.
3. When running, do not touch the running film roll or roll core by hand to avoid personal injury caused by hand entrapment.
4. During the operation, it is forbidden to scratch or cut each roller core with a knife or a hard object. First package: Before the equipment is put into operation, check whether the working positions are properly adjusted. If lubrication is required, the grease should be added in advance. Check if the tool is sharp. After all the normal, you can run the empty car first, check whether there is any abnormality, and input the processing order into the computer to check the order in advance; after the equipment is put into operation, adjust the optimal working condition of the equipment according to the production situation to ensure the cutting machine pressure. The marks are moderate, the cuts are burr-free, and the trimming positions on both sides are appropriate. Ensure that the cross-cutting machine has smooth paper feeding and accurate cutting length. For vertical and horizontal cutting machines that are connected to production management, it is also necessary to monitor the operation of the machine at the same time. Beware of paper jamming and defective products. After the work is finished, clean the equipment on time. The ash and paper scraps are inspected, and the grinding wheel is inspected, and the water in the water purifier and the gas storage tank are drained to check whether there is abnormality in
the running part. Then, according to the instructions, cut off the power supply and maintain the computer operating system.